TOV ZV Gidrospetsbud

Specialized construction and geotechnical work in Ukraine

  • UA
  • RU
  • EN
  • About the company
  • Activities
    • Special activities
    • Civil and erection works
    • Design
    • Other types of work
    • Menard Technologies
      • DSM Columns
      • CMC Columns
      • BMC Columns
      • Susceptible Columns MSC
      • Compaction Grouting ISR
      • Vibroflotation VF
      • Jet Grouting JG Columns
      • Dynamic Compaction DC
      • Impulse Compaction RIC
      • Gravel Columns SC
      • Dynamic Replacement DR
      • Combined Columns MCC
      • Vertical Drains VD
      • Vacuum Consolidation MV
      • Micro-explosions MMB
  • Completed sites
  • Equipment
  • Engineers
  • Photos of sites
  • Contacts
Menard Technologies
Menard’s official site
DSM Columns
CMC Columns
BMC Columns
Susceptible Columns MSC
Compaction Grouting ISR
Vibroflotation VF
Jet Grouting JG Columns
Dynamic Compaction DC
Impulse Compaction RIC
Gravel Columns SC
Dynamic Replacement DR
Combined Columns MCC
Vertical Drains VD
Vacuum Consolidation MV
Micro-explosions MMB

Photos of sites

Reinforcement work in the manufacture of a monolithic pool basin. Customer: FIT HAUS.
Reception of concrete into auger piles. Site: four pillar  press. Blast Furnace-3. Customer: PAT (public joint-stock company) Zaporizhstal.
Installation of auger piles ⌀ 1020 mm. Site: A 500 MW wind power station in the Priazovsk and Melitopol region, stage 1. Client: TOV (limited liability company) EuroCape Ukraine I.
Reception of concrete mix in the manufacture of piles. Site: A 500 MW wind power station in the Priazovsk and Melitopol region, stage 1. Client: TOV (limited liability company) EuroCape Ukraine I.
Static testing of soil with piles ⌀ 1020 mm. Site: A 500 MW wind power station in the Priazovsk and Melitopol region, stage 1. Client: TOV (limited liability company) EuroCape Ukraine I.
Test bench for a load of 1000 tons. Site: A 500 MW wind power station in the Priazovsk and Melitopol region, stage 1. Client: TOV (limited liability company) EuroCape Ukraine I.
The Installation monolithic grillages, columns and floors. Site: Construction of the main ventilation unit of the “Ekspluatatsiina” mine. Dniprorudne. Zaporizhia region Customer: Zaporizhia Iron Ore Plant.
Monolithic overlap. Formwork work. Site: Construction of the main ventilation unit of the “Ekspluatatsiina” mine. Dniprorudne. Zaporizhia region Customer: Zaporizhia Iron Ore Plant.
Installation of auger piles. Site: Retaining wall of DGES- 2. Customer: Ukrhydroenergo.
Manufacturing reinforcement frames. Site: Primorskaya wind power station, 1 stage. Customer: DTEK.
Reinforcement work for the foundations of grain silos with a capacity of 10.322 thousand. m3. Site: Reconstruction of the plant for the processing of oilseeds. Address: 22 Matrosova lane, in the town of Volnyanske, Zaporizhia region. Customer: TOV (limited liability company) Agroproinvest 08.
Concrete work for the foundation of grain silos with a capacity of 10.322 thousand. m3. Site: Reconstruction of the plant for the processing of oilseeds. Address: 22 Matrosova lane, in the town of Volnyanske, Zaporizhia region. Customer: TOV (limited liability company) Agroproinvest 08.
Installation of secant piles ⌀ 800 mm. Site: Construction of the main ventilation unit of the “Ekspluatatsiina” mine. Dniprorudne. Zaporizhia region Customer: Zaporizhia Iron Ore Plant.
Concrete works. Site: “Construction of a monolithic bowl of a swimming pool basin”. Customer FIT HAUS.
Docking of reinforcement pile frames ⌀ 1020 mm. Site: Primorskaya WPP 1 turn. Customer: DTEK.
Immersion of prefabricated reinforced piles. Site: A transshipment terminal with the shipment of grain and oil crops to the river transport TOV (limited liability company) JV NIBULON. Ternivka village. Zaporizhia region Customer: TOV (limited liability company) JV NIBULON.
Soil test with tangential piles ⌀ 520mm. Site: Residential complex "Perlyna" Lermontova Street, Zaporizhia. Customer: TOV (limited liability company) Adamant.
Installation of tangential piles ⌀ 620mm, ⌀ 420mm. (CFA). Site: Reconstruction of gas cleaner of the rotary kiln No.1 “UG Cement”. Customer: "YUG Cement". Olshanske urban-type settlement. Mykolaiv region.
PILE Integrity Tester Pit-W (USA) test for determining the length and integrity of piles using an acoustic non-destructive method at a construction site. Site: A 500 MW wind farm in the Priazovsk and Melitopol region, stage 1. Customer: TOV (limited liability company) EuroCape Ukraine I.
Drilled core of concrete. Site: "Gas cleaning sinter machine 1-6." When drilling soil with casing with a diameter of 1000 mm at a depth of 12 m, drilling was carried out on reinforced concrete (old retaining wall) with coring. Customer: PAT (public joint-stock company) Zaporizhstal.

◄12
Menu:
  • About the company
  • Activities
    • Special activities
    • Civil and erection works
    • Design
    • Other types of work
    • Menard Technologies
      • DSM Columns
      • CMC Columns
      • BMC Columns
      • Susceptible Columns MSC
      • Compaction Grouting ISR
      • Vibroflotation VF
      • Jet Grouting JG Columns
      • Dynamic Compaction DC
      • Impulse Compaction RIC
      • Gravel Columns SC
      • Dynamic Replacement DR
      • Combined Columns MCC
      • Vertical Drains VD
      • Vacuum Consolidation MV
      • Micro-explosions MMB
  • Completed sites
  • Equipment
  • Engineers
  • Photos of sites
  • Contacts
Contacts:
  Ukraine, Zaporizhia, 69006
    pr. Soborny Ave. 234/65
+38 050 341 83 82
+38 050 456 97 06
  info@gss.company
Certificates:
Certificate of Ukrainian Society of Soil Mechanics, Geotechnics and Foundation EngineeringMenard Partners Certificate
© TOV ZV Gidrospetsbud , 1998-2026